July 16, 2007

Hurry up and Wait

First week of June I had two walkthroughs -- one at Birch, the other at Douglas. The smaller job, at Douglas, was wirtten up on June 11th and June 12th.

The job at Birch is bigger, adding 50 cubicles. Originally they wanted to move in on July 1st? Too ridiculous to take seriously. However the feeling was that they wanted to get the people in quickly. Well over a month ago. In both locations. THought about it this morning and checked on Douglas -- looks exactly as I left it, including no backboard for the WiFi on the 1st floor where I rushed to get the cable in (the above links.)

Over at Birch:

Total work done since the walkthrough -- Nothing. (Execpt my cleaning out the old 25-pair KTS cabling to make room for the cat-5.) First photos show cubicles that need to be removed. Third, squatters that need to move. Last three, real estate junk being stored has to go away. No one moves in until the desks and partitions are in. Desks and partitions await the electrician relocating power outlets and holes in the floor for the LAN cables. I need to run about 32 new sets of LAN cables and relocate 18 more -- to be done after the electricians have relocated power and holes, before the partitions get placed. Electricians can't do anything until real estate cleans up the old partitions and stuff and removes existing cubs.

And it still looks exactly as it did on the walk through. Nothing has been done.

Posted by Paladin at July 16, 2007 09:32 PM