Today I finished off the LAN equipment for the D building, where I work. The changes are less visible than the B-building. The old Cabletron hub was in a list-15 cabinet standing where I stood to take the picture. It was cabled to the top row of jacks on the two patch panels. The Cabletron was replaced by a pair of wall-mounted Cisco 3524 switches. A complete LAN for 35-40 users and 6-8 printers takes up less than a 48 inch x 60 inch space on the wall.