July 30, 2007

Verint Redux

January 10-20th, 2004, saw me installing a Verint system to monitor telephone calls -- I was one of a few offices being used for a trial of the Verint system. October 28th they took the cabinets away, trial over.

The Avaya phone system went in the end of '05. I knew they would be wanting to install a Verint or equivalent, so I planned the installation to include a cabinet and BB space for monitoring.

The new Verint cabinet arrived today:


As you can see, I was ready and waiting. All I need is for Sabe Electric to rearrange the AC again to give me a couple of 20-amp twistlocks (the circuits are already existing under the floor) and to bolt the cabinet thru the raised floor to the real floor so it won't move in an earthquake. Need to run 10 each, 15 foot cables, 25-pair male phone connector to an M-66 block on the BB. Need to run a LAN feed for the VAM.

While I labeled the photo as VAN & SAM, seeing as the Verint cabinet is labeled and cabled for the SAM. Got a call from the designer -- nope! Can't allow that. The SAM, a simple little 2RU server, get to join the other servers in the Compaq cabinet, just out of the picture to the left of the Avaya.

Posted by Paladin at July 30, 2007 06:01 PM