To move 50 or so phones from existing locations to the desks in the area we have been working on for the last two weeks. Talked to the boss and we have OT approved for the whole crew (all three of us) for 4 hours Friday evening and 8 hours Saturday.
I'm not too sure about everyone else.
As of right now the place looks mostly the same as it did on the 7th. The big change from yesterday is that the electrical is complete. The 3"x3" runs have been closed. Each and every outlet box for each and every desk has a coiled up ground wire ready to ground the desks.
But all of the furniture is still over in the north half, the south half still has carpet tiles and floor tiles off. There are also stacks of drywall, metal studs, and insulation. Unless they remove the stacks, replace the tiles, and move and place the partitions and desks tonight we will be bumping with the movers Friday evening.
Posted by at August 12, 2004 08:41 AM