Have another project going at work, some new voice system, vendor supplied and supported. But I have to provide racks, power, wire between the terminal room and the jacks at each client position.
The power arrived yesterday. "You got a forklift?" .... no .....
So the driver breaks down the pallet on his truck and hands me down each box individually which I place at the curb. One Liebert 2000 and a pair of Liebert 3000's -- both with their auxillary batteries for longer up time when power is down. If I believe the labels I just moved a quarter ton.
Posted by at April 22, 2004 11:26 AM