Mostly. The cables are all run. The cross-connects are all run except for a dozen or so that are to positions that were not designated on the ISDN equipment and which will have to be tracked down from one by one by getting the associated telephone number, calling it, having the person answering wave their hand so I can find them, unplugging their phone to see which line card goes red.
Came in at 6am to move all of the cables on the ISDN equipment in the '41 building to half-tap the terminals. Lost about 4 positions. *SIGH* Then the reps came in and starting working so I cannot work on the broken positions without knocking down the rest of the dozen that ride the same 25-pair cable.
Looks like I'll be working 6-2:30 for a while so I can get to these troubles early morning.