So we got it done. Last weekend, but I've been a bit to busy to get to the blog. This is the same corner shown in the Oct. 1st entry. We moved the m-66 cross-connect blocks, voice cabling, and the telephone system's blackbox onto the backboard. We untangled the mess of wires, separating Voice from Data, and tucked them away in Panducts. The Lan-in-a-Box has been shipped back to the owners, the rolling table (talk about not earthquake safe!) has been removed. Another fine job completed. (except for placing 2-inch Panducts accross the racks under the hubs to tidy up the patch cables and there's a plug of duct-seal on top of the power outlet on the wall that needs to be put back into the conduits to seal them.)